This is based on morning and evening peak hours.
Originally posted by Wanmah 10:This is based on morning and evening peak hours.
What about ur other
Project Which is On Hold?
Mod edit: Link added.
Renamed by veyron16.4 to [openBVE] CCL: Marymount to Paya Lebar
What about your other route? Shall I lock it?
As a suggestion for you, do try Paya Lebar - Marymount instead, and best if you could do Dhoby Ghaut - Marymount, so that an extension to Harbourfront will be easier (By the time you have completed Marymount, then Harbourfront sector should be ready to open, trust me for this.)
My suggestion: Merge these 2 threads.
Originally posted by Veyron16.4:Renamed by veyron16.4 to [openBVE] CCL: Marymount to Paya Lebar
What about your other route? Shall I lock it?
ReRenamed to [openBVE] Circle Line [MRM to PYL]
Originally posted by joeyfjj:ReRenamed to [openBVE] Circle Line [MRM to PYL]
RereRenamed to [openBVE] Peak hour Circle Line Service [CW: MRM to PYL]
To TS: Please do not post things that contains the direction / service date and time unless you are really committed to develop a route for it. By the way, it is better for you to do the full route first then do the peak hour service. (Just take out the station and stop commands, so that it can have the full route without via the non-service areas for the peak hour service.
Originally posted by Samuel Lee:RereRenamed to [openBVE] Peak hour Circle Line Service [CW: MRM to PYL]
To mods: Project thread titles should be in the following format:
[BveVersion] LineName [Direction: StationStart to Station End]
[BVE 2] Circle Line [ CW : HBF to DBG ]
[BVE 4] North South Line [ NB : JUR to MRB ]
[openBVE] East West Line [ EB : JKN to PSR ]
[(open)BVE] North East Line [ NB : HBF to PGL ]
Please leave details like time and weather onditions on the first post of the thread.
Mod note: Re-Re-Re-Re-Renamed to [openBVE] Circle Line [CW: MRM to PYL].
Suggestion:
I think you work on your route (MRM - DBG) first before doing these short trip services. Same as the EWL.
Could it be a chance that the TS is just posting threads on all train service (Of CCL)? If that is the case, both threads will have to be locked. Otherwise, stick to one project becoz you cannot spare that much effort and time without compromising studies / work.
@Samuel Lee
Are you talking to me or someone else?
Originally posted by Bryanwee1:@Samuel Lee
Are you talking to me or someone else?
Joker lah you, who started this thread?
PS: TS is A.K.A (As known as) Thread Starter. So, which thread are you in now?
Wait. B4 u develop the line , u need some1 to develop the rolling stock for CCL 1st rite? [Alstom Metropolis C830]
Originally posted by Operation//Overkill:Wait. B4 u develop the line , u need some1 to develop the rolling stock for CCL 1st rite? [Alstom Metropolis C830]
Me and SBS7322B will build once the ACW Circle line is completed. For more information in the ACW Circle Line, here.
Originally posted by Bryanwee1:Me and SBS7322B will build once the ACW Circle line is completed. For more information in the ACW Circle Line, here.
Hope that some1 will do SBST's C751A :) Love the traction sound :)
I will start the 2nd Project after i complete the route from Marymount to Dhoby Ghaut!
Originally posted by Wanmah 10:I will start the 2nd Project after i complete the route from Marymount to Dhoby Ghaut!
So How is Your Marymount to Dhoby Ghaut Progress?
great
Originally posted by Wanmah 10:great
Which station has been completed?
i have to think about it first.
Originally posted by Wanmah 10:i have to think about it first.
Huh??????
Originally posted by Bryanwee1:Huh??????
LOL WHAT A BIG REACTION
Originally posted by Habbo lifehurts-forever:LOL WHAT A BIG REACTION
Nice lie, but lying isn't good.
Originally posted by yellowflip999:Nice lie, but lying isn't good.
What Lie?