Originally posted by SBS7322B:NOTICE: All projects by SBS7322B will be put on hold until further notice due to Prelims. Bryanwee1 will continue help EWL first. The release date for this route will be postponed together with the C830. We apologise for any inconveniences caused.
The CCL team.
I don't know whether your school's schedule is the same as my sch, but when does the Prelim end?
<Off-Topic> All the best in your Prelim!
Originally posted by SBS8892R:
I don't know whether your school's schedule is the same as my sch, but when does the Prelim end? And, don't you have to study for PSLE?<Off-Topic> All the best in your Prelim!
LOL? He already er... took his PSLE.
Originally posted by jerryonhere:LOL? He already er... took his PSLE.
<O-T>
Just to add on: long time ago
Originally posted by SBS8892R:
I don't know whether your school's schedule is the same as my sch, but when does the Prelim end? And, don't you have to study for PSLE?<Off-Topic> All the best in your Prelim!
This Prelims is for my GCE 'O' Levels and not for PSLE. You probably have mistaken me for a younger person. My GCE 'O' LEvels officially ends on the 15 November 2010 1500hrs.
NOTICE TO ALL: This project will 'on hold' for a while due to my CCA (Infocomm Club) and some school works and I am very busy doing designs..... This project will resume at somewhere end of July. Thank You for your cooperation!
Originally posted by SBS7322B:This Prelims is for my GCE 'O' Levels and not for PSLE. You probably have mistaken me for a younger person. My GCE 'O' LEvels officially ends on the 15 November 2010 1500hrs.
I probably mistaken myself for being so young that I don't know those those "GCE 'O' levels". I just hate school so I don't know whats happening ahead. Sorry.
Originally posted by SBS8892R:
I probably mistaken myself for being so young that I don't know those those "GCE 'O' levels". I just hate school so I don't know whats happening ahead. Sorry.
Doesn't mean you hate school then you don't study, it's like even though you hate maths, you still have to study it. My point is quite simple: Study, even if you hate school. It'll do good in your life next time.
Originally posted by yellowflip999:Doesn't mean you hate school then you don't study, it's like even though you hate maths, you still have to study it. My point is quite simple: Study, even if you hate school. It'll do good in your life next time.
:) It make sense.
Originally posted by SBS8892R:
I probably mistaken myself for being so young that I don't know those those "GCE 'O' levels". I just hate school so I don't know whats happening ahead. Sorry.
If you like trains that much =P Go poly, get diploma for engineering and you can land yourself in a good job in the future. Don't worry you have plenety of jobs from 2020-2030 (278km -> 540km). I bet there would be at least 2 operators. So you don't need to compete crazily.
Good News: The release will be delayed. However, I will throw in extra goodies for you all! Want to know? The answer: Version 1 originally is from Dhoby Ghaut to Stadium. But now, it's from Dhoby Ghaut to Paya Lebar!
27/08/2010's update:
Crossover between Stadium and Mountbatten done:
EDIT: Mountbatten is now completed
EDIT X2: This project is no longer on hold anymore, moderators, can you backspace the [ON HOLD] from the thread title. Thx =D
EDIT X3: Dakota is now completed
Originally posted by Bryanwee1:27/08/2010's update:
Crossover between Stadium and Mountbatten done:
EDIT: Mountbatten is now completed
EDIT X2: This project is no longer on hold anymore, moderators, can you backspace the [ON HOLD] from the thread title. Thx =D
EDIT X3: Dakota is now completed
Nice Job.
Originally posted by Bryanwee1:27/08/2010's update:
Crossover between Stadium and Mountbatten done:
EDIT: Mountbatten is now completed
EDIT X2: This project is no longer on hold anymore, moderators, can you backspace the [ON HOLD] from the thread title. Thx =D
EDIT X3: Dakota is now completed
Lol. I do not need to see your desktop. X_X
28/08/2010's update:
Paya Lebar is completed!
Paya Lebar middle platform: (Haven't add PSDs for the other side...)
Originally posted by Bryanwee1:28/08/2010's update:
Paya Lebar is completed!
Paya Lebar middle platform: (Haven't add PSDs for the other side...)
Nice floor!
Originally posted by Bryanwee1:28/08/2010's update:
Paya Lebar is completed!
Paya Lebar middle platform: (Haven't add PSDs for the other side...)
I think I better take more photos of the floor. Everyone's using the Bishan default floor. =.=
Originally posted by Bryanwee1:28/08/2010's update:
Paya Lebar is completed!
Paya Lebar middle platform: (Haven't add PSDs for the other side...)
Nice job, Suddenly everything speed up.
Originally posted by SBS7322B:I think I better take more photos of the floor. Everyone's using the Bishan default floor. =.=
That's Changi Airport floor.
Just widen Paya Leber platforms:
LOL, I know Most CCL stations use the same floor scheme with a little bit of difference between stations.
Macpherson and Paya Lebar perfect for perverts because you know why... =P
The flooring too reflective liao.
PYL and Macpherson have the same tiles. So you can always copy paste Macpherson to PYL
Ride from Dakota - Paya Lebar: Video uploaded:
Originally posted by Bryanwee1:Ride from Dakota - Paya Lebar: Video uploading...
whoa.
Originally posted by Funkymark4211:whoa.
??? "whoa" for what lol...
Originally posted by Bryanwee1:??? "whoa" for what lol...
i mean suddenly so fast everything finish