Originally posted by Merc-O530:Cant download Samuel's patch...... Idk why....
U PM me ur hotmail or whatever, I try to send to you. The patch is a full version exclude Westbound (My main focus)
V0.1D(End April-Early May)
-Redhill extension
-Update of 'Termination.wav' due to addition of Redhill
V0.1E(Unknown)
-HHPSDs at Clementi
-Jurong Station minus the complex x-overs
OpenBVE Xclusive!
131/132 departing Clementi with HHPSDs
http://www.youtube.com/watch?v=LJ-KYHnYFQA
BTW: Expect a Developers' Edition of the Route with PSDs at Clementi by the 2nd Week of May.
Originally posted by Veyron16.4:V0.1D(End April-Early May)
-Redhill extension
-Update of 'Termination.wav' due to addition of Redhill
V0.1E(Unknown)
-HHPSDs at Clementi
-Jurong Station minus the complex x-overs
Jurong station means Joo Koon - Redhill or Jurong - Redhill? Can use NSL's Jurong station?
Originally posted by Samuel Lee:Jurong station means Joo Koon - Redhill or Jurong - Redhill? Can use NSL's Jurong station?
Answer to second question: Difficult.
Irrelevant Post, deleted by MOD
Originally posted by TPS Timothy Mok:Deleted
I am fine with that idea, but, apart of different developer's schedule & ideas which makes it difficult, I have to serve NS by 2011 or 2012. (I graduate from my poly in April 2011)
Originally posted by Samuel Lee:Jurong station means Joo Koon - Redhill or Jurong - Redhill? Can use NSL's Jurong station?
JUR-RED
Lol Cool, Smallest Station = Redhill Thats will be easy? Lol
Originally posted by Habbo lifehurts-forever:Lol Cool, Smallest Station = Redhill Thats will be easy? Lol
I think CCL Dhoby Ghuat Station is the winner for that.
Originally posted by SBS7322B:I think CCL Dhoby Ghuat Station is the winner for that.
Off Topic: Oh Why? i Always Thought Redhill was The Smallest Elevated Island Platform Station
On Topic: Cross Overs Between Redhill and Queenstown?
In fact, I think Redhill hard, bcoz, Redhill has trapezium shape, as jcqh mentioned in the past.
Originally posted by Samuel Lee:In fact, I think Redhill hard, bcoz, Redhill has trapezium shape, as jcqh mentioned in the past.
I Know That Lols. Redhill could be one of my most Firmiliar Stations. I Always Alight there, Therefore most of my recordings end at redhill too.
Originally posted by Samuel Lee:In fact, I think Redhill hard, bcoz, Redhill has trapezium shape, as jcqh mentioned in the past.
Progressively down the width?
Originally posted by joeyfjj:Progressively down the width?
| \ <-- Platform
For those who think I am slacking, here's proof that I am not
X-over after Queenstown (Works In Progress)
PSDs @ Clementi (Works In Progress)
Converging Tracks after Queenstown (Completed)
ATS Enabled!
Currently starting on:
Jurong East Station
Ratis
Originally posted by Veyron16.4:For those who think I am slacking, here's proof that I am not
X-over after Queenstown (Works In Progress)
PSDs @ Clementi (Works In Progress)
Converging Tracks after Queenstown (Completed)
ATS Enabled!
Currently starting on:
Jurong East Station
Ratis
Wow, I cant wait for the developers' release! BTW, despite EB & WB are separate development efforts, I would like to integrate your RATIS and I would like to apply the new track / viaduct objects on ur EB as well. So, would you mind letting me do so and might require a slight postpone.
Suggestion:
In order to save the need to change the RATIS in future, I suggest putting the RATIS as the terminus station (EB - Pasir Ris, WB - Joo Koon and SB for NSL - Marina Bay) and until the terminus station (EB - Redhill, WB - Bugis and SB for NSL - Bishan) put DNB sign and whats more, put a special announcement on train fault or whatever and terminates there.
Update 27/4/2010
Do you guys prefer me to release the Dev. Edition of the route now or wait until I complete the announcements?
Originally posted by Veyron16.4:Update 27/4/2010
- Redhill extension(Do note that due to the current limitations of openBVE, Redhill's platform is not trapezium in shape)
- RATIS is not done.
- HHPSDs @ CLE has been changed.
- Termination.wav updated
Do you guys prefer me to release the Dev. Edition of the route now or wait until I complete the announcements?
complete the announcement. Whats wrong with the RATIS?
Originally posted by Samuel Lee:complete the announcement. Whats wrong with the RATIS?
Nah....cant be bothered to do the RATIS
Originally posted by Veyron16.4:Nah....cant be bothered to do the RATIS
O i see, would you implement ATC for the next release because all the latest C151 / C651 and upcoming C751B are ATC equipped?
Originally posted by Samuel Lee:O i see, would you implement ATC for the next release because all the latest C151 / C651 and upcoming C751B are ATC equipped?
It's not easy to do that, so far, I'm lazy to learn how to put it in.
Any news or surprise to us, as the users??
Originally posted by Samuel Lee:Any news or surprise to us, as the users??
Stay tuned to the EWL website