Originally posted by xXlccporXx:just asking: when is the new version going to release?
BTW: Bumps
Don't bump one month before the last post.
Back working, if anyone has textures or pictures of Jurong East station, the route info and station name panels, the pillars, the HW and TW, anything, please contact me - I need them!
Originally posted by joeyfjj:Back working, if anyone has textures or pictures of Jurong East station, the route info and station name panels, the pillars, the HW and TW, anything, please contact me - I need them
Please contact me, I may have the images you want. :)
Jurong East Interchange/Terminal.
If you complete those above, when can NSL developer starting Bishan to Marina Bay?
Originally posted by c751bLoVuR:If you complete those above, when can NSL developer starting Bishan to Marina Bay?
Maybe...
Originally posted by c751bLoVuR:If you complete those above, when can NSL developer starting Bishan to Marina Bay?
If I learn coding next year, and the developers are doing Bishan to Marina Bay, maybe I can help with the City Hall/Raffles Place to Marina Bay sector
Originally posted by c751bLoVuR:If you complete those above, when can NSL developer starting Bishan to Marina Bay?
According to their site, the next stage for them to do is to add the station object and we start to see some on Jurong East (And not for other stations for now). According to joey, he said that only front 25m of the station will come with such textures because these enhancement lags the route.
I seriously suggest a lite version to it, but the problem is the developer will have to require a bigger storage size since both lite and high quality (usual) version are not compatible (Such as lite version uses the generic station / or front 25m with textures as shown by joey while full version is exact duplicate of real world when fully completed.)
Hint: For me, EWL PSR - JKN route is considering one such, when the lite version will omit full tunneling on City Hall - Raffles Place and no tunneling on both side of tracks except on the station + / - 50m or so. Next time can even have a station with full object similar with his.
Eh, now JEMP almost completed. Can use post-JEMP tracks or not?
The viaducts should be updated, I'll see as I go along.
Well, it seems the NSL is known by someone outside SG now... Literally.
Originally posted by jerryonhere:Well, it seems the NSL is known by someone outside SG now... Literally.
Interesting Discussions Over there ... MUAHHAA
Originally posted by jerryonhere:Well, it seems the NSL is known by someone outside SG now... Literally.
Well from the discussions, they don't seem to know the lastest released version. Someone update the front page please. THey seem to be downloading the V0.8 Still.
Originally posted by Bngauw:Well from the discussions, they don't seem to know the lastest released version. Someone update the front page please. THey seem to be downloading the V0.8 Still.
What is the latest release and download link. I haben update 4 a long time.
Originally posted by C751A 70049/70050:What is the latest release and download link. I haben update 4 a long time.
This is the last link Joey posted as the official pre-release on the thread. http://cid-485a7d737b866af7.office.live.com/browse.aspx/North-South Line for openBVE/North South Line 0.95.20100622 Pre-release
Originally posted by jerryonhere:Well, it seems the NSL is known by someone outside SG now... Literally.
PSD = Passenger Screen door???
Originally posted by Boylush:PSD = Passenger Screen door???
Platform lah. They just donno anyhow say.
Originally posted by Boylush:PSD = Passenger Screen door???
Thanks 4 e update. Should i include in next dummy release IF Version 1.0 of NSL is still not ready?
Oh ya NSL developers, can someone at least try and make an effort to fix that Bishan curve on the opposite direction, even adding that Bishan sidings is not a priority for now?
Originally posted by C751A 70049/70050:Oh ya NSL developers, can someone at least try and make an effort to fix that Bishan curve on the opposite direction, even adding that Bishan sidings is not a priority for now?
MY plan now is to add sidings and other scenery bit by bit. The next release, therefore, will be Jurong East to Bukit Gombak/Batok..
Originally posted by joeyfjj:MY plan now is to add sidings and other scenery bit by bit. The next release, therefore, will be Jurong East to Bukit Gombak/Batok..
Looks funny lor.
Since you want to focus on Jurong East, then the above image looks odd. Maybe your EB tracks do not go that far can? Because it seemed like the WB tracks will cut through EB tracks as if a T junction.
Originally posted by C751A 70049/70050:
Looks funny lor.
Since you want to focus on Jurong East, then the above image looks odd. Maybe your EB tracks do not go that far can? Because it seemed like the WB tracks will cut through EB tracks as if a T junction.
Yay! Now Bishan is done well! My town!
[EDIT] Yay! 255th Post!
Originally posted by C830/C751B/C951 Fan:Yay! Now Bishan is done well! My town!
[EDIT] Yay! 255th Post!
Its done a long long long long long long long long long long long long long long long long long long long long long long long long long long long long long long.... Time ago. Btw Gonna do the missing last crossover from depot at Bishan. Self-edit not for release.
Added:
Additional Crossover From Depot
Run Sounds.
Dark Track. For Tunnel
Now NSL:
Progress: Phase 1.5
Since you adding Station Objects based on: http://sites.google.com/site/nslforopenbve/about
Milestones and Phases
- Phase 1: Toward Milestone 1
- Milestone 1: Finished the skeleton of the route up to Bishan.
- Phase 2: Toward Milestone 2
Milestone 2: Station objects added. Phase 3: Toward Milestone 3 Milestone 3: Scenery added. Major landmarks will be reproduced, while less prominent landmarks will be partially fictional. Phase 4: Toward Milestone 4 Milestone 4: Finish underground section beyond Bishan and overground from Jurong East.