i am not complaining about the drilling but the purpose of the job. i am sure there are many things in need of repair or upgrade.Originally posted by ditzy:Time is money, the earlier they finish, the less money they lose.
Apples look good on the outside, there could be worms on the inside.Originally posted by dragg:i am not complaining about the drilling but the purpose of the job. i am sure there are many things in need of repair or upgrade.
why work on the floor tile when they are perfectly ok?
they should save up and spend the money on lift upgrading.Originally posted by ditzy:Apples look good on the outside, there could be worms on the inside.
WEll, U know the... erm, system. A level road could be resurfaced many times, but no one fixes the street lamps ....Originally posted by dragg:so early in the morning and the contractors are already drilling away.
the floor tiles downstairs look perfectly ok to me. i confirmed with my neighbour on this.
i wonder who took the iniative to do this.
what is the purpose? dont they have better things to work on?