No, you must meant the middle platform right? The sides got Marymount bound one. Middle platform is meant to reduce time wait (Frequency) of Marymount / Paya Lebar bound between Paya Lebar to Marymount (Which is rumoured to be extended to One-North when CCL Stage 4 / 5 opens by second half of 2011 (My take / guess: August 2011, same day as when Woodleigh opens)
Check the station layout here: http://en.wikipedia.org/wiki/Paya_Lebar_MRT_Station
Originally posted by Lord dejavu:thanks yellowflip for the link.
so just to confirm, Platform A is the one that goes in the Marymount direction?
Yeah, and if you're transferring from the East West Line, you have to walk to the other platform, further away from the platform to Dhoby Ghaut.
There's already a topic on this.
Peak hr time for Marymount to Paya Lebar is 3 mins. Other times are 7 mins. This one to Dhoby Ghaut forever is 3 mins. SMRT use additional train using this method la.
Link: http://politics.sgforums.com/forums/2080/topics/413160
Originally posted by Lord dejavu:
So you mean it is possible to go to Bishan from Paya Lebar anytime of the week?
This is not KTM where you can only travel during certain time of the week. This is SMRT.
Originally posted by C751A 70049/70050:This is not KTM where you can only travel during certain time of the week. This is SMRT.
KTM has 14 passenger trips a day to and from Singapore.
Originally posted by C751A 70049/70050:This is not KTM where you can only travel during certain time of the week. This is SMRT.
KTM is like SMRT. Any time can travel, rain or shine, still operational.
Originally posted by Lord dejavu:omg i super noob. i went to the wrong platform
.
indeed. and you had to enquire in a public forum. lol. but nevermind lah, there's no profile picture attached to everyone here.
it's the 1st ever single-level, 3-track, 4-platform underground station hence you don't expect anything beyond the track(middle platform) and you thought it was a reflection is it?
Originally posted by Interception_7:KTM is like SMRT. Any time can travel, rain or shine, still operational.
Lol, he must be meant that every a few hours per trip or so. Unlike the MRT ones within 15mins (12mins) per train.
Next time ah, Peak hr take DHG platform lo; Centre track go Marymount - very short waiting time. Dhoby Ghaut I don't know why 7min waiting time; Marymount got LOTS of people?
Conclusion: Messy station