Still has no change to 089/090 thou, I feel that this train is okay, but just that ppl are complaining that 089/090 condition is not good especially at the aircon and ceiling...
I feel that after 095/096 comes out after mod, the flat wheels can still be heard..
Someone Wearing the LTA uniform was giving out the JEMP brochures at Bukit Batok Today =D
Originally posted by c751bLoVuR:Which one?? Why the first car 3 doors and the second 4 doors?
Because I drew it like that :)
...means that first and last platform doors of the station will not be activated.
Originally posted by Kawac151:Wow. nice..=D
Thanks!
Originally posted by smrt3099:Good drawing
Thanks!
Originally posted by SMRT/SBS Transit:Excellent work ! Keep it up ! Hope you can send us more pictures :)
Originally posted by Kawac151:hope u can send more drawings :p
I will try!
Originally posted by d143b2:... your drawing is too perfect
...
no one understands what i drew ...
nonono i don't know how to draw wheels thats why i omitted them...
My drawing is not perfect but i love to draw!
spamming in progress...
I think i mentioned this before...
I hate underground lines! So I just came up with a solution! Use suspension tracks and stations! The suspended tracks are held up by the station, while the station is suspended and held up by strong "holders". These "holders" can be used for commuters entering or exiting the station "clementi?" How does this sound?
ps do u know how to find the ranking of a topic?
spamming in progress...
jurong can have a lrt line that is suspended(example mentioned above)!
*Breaks combo*
Breaks spam...
spamming in progress...
spammers may beak the chain!
Spamming in progress...
Perhaps eastern region line, north shore line and west coast line should combine to form Southern Region Line (SR)
Lets Start a new Topic. Called "Another TE1Spare Train?"
Spamming in progress...
The old mrt stations (east west and north south) should undergo upgrading and put art in transit programme in it!
Spamming STILL in progress...
After the tuas depot has been built, the ulu pandan should be closed for upgrading...then build buildings on top of it,...perhaps jurong lrt can also have a depot there!
Originally posted by Gs97:I think i mentioned this before...
I hate underground lines! So I just came up with a solution! Use suspension tracks and stations! The suspended tracks are held up by the station, while the station is suspended and held up by strong "holders". These "holders" can be used for commuters entering or exiting the station "clementi?" How does this sound?
EDIT:
Use suspension tracks and stations for future lines! The suspended tracks are held up by the station, while the station is suspended and held up by strong "holders". These "holders" can also be used for commuters entering or exiting the station like clementi, dover or cove. Perhaps when the bukit panjang lrt line is rebuilt and the jurong lrt line is built, they can use this method. Perhaps next time future mrt lines can use this method! ...suspended hdb flats, suspended buildings, suspended river, suspended airport, suspended expressway... How does this sound?
Breaks...
Spamming ended.
Perhaps i'm going to draw future stations next, but have to prepare for exam...maybe next time!
227/228: I'm finally back in CGL.