Originally posted by sbs8104h:they should consider extending futher down towards Marina Barrage lerh
Marina Barrage not high demand. Likely that will be covered by ERL.
Originally posted by LTnF1fan:Marina Barrage not high demand. Likely that will be covered by ERL.
not optimisitic.
Because it's going to be very cramp considering 10 lane MCE.
Originally posted by willis_chong:Another 3rd train will go for one round on CGL at 8am, returning CHD at 8.30am.
Nope, I checked the morning schedule, all 11-13min intervals.
Originally posted by sbst275:
not optimisitic.Because it's going to be very cramp considering 10 lane MCE.
They can dig one of them deeper.... Its very confusing, I don't have the exact plans..
Originally posted by LTnF1fan:They can dig one of them deeper.... Its very confusing, I don't have the exact plans..
cost control
Originally posted by Interception_7:
Actually, there were a total of 3 stations proposed along the line in the Marina Bay area...only 1 was constructed (current Marina Bay station)...
Ok, one is current Marina Bay , the other is Marina Barrage, which had been considered for the Marina South Extension and Marina Pier, the confirmed and building in progress of Marina South Extension.
Originally posted by Interception_7:This is the location of the new station, and the extension too.
and not sure if this will be true...a scissors crossover after the station, as stated in the diagram.
Most likely NSL/EWL cant do scissors crossing
Wonder how it'll look like when it's completed...
Originally posted by smrt3099:Most likely NSL/EWL cant do scissors crossing
Are you sure? I wonder what type of crossover does Changi Airport and Marina Bay use now...
Originally posted by NickLim™:Are you sure? I wonder what type of crossover does Changi Airport and Marina Bay use now...
Actually yes, CGA and MRB uses Scissors, just like Dhoby Ghaut CCL.
Originally posted by kench-an:It's official.
The NSL extension station is called Marina Pier (NS28)
Marina Pier station started constructions???
107/108 STARIS error updated with NS28 Marina View
Originally posted by smrt3099:107/108 STARIS error updated with NS28 Marina View
Sorry. It's my fault not STARIS larh.
Originally posted by jcqh:On all days (Weekday, weekend, PH), there would be 2 trains plying the route from the 1st trip at 5+ in the morning til 7+ in the evening, where a 3rd train would be deployed. This train will run until 10+, before returning to the depot and the original 2 trains will continue running til nearly 12mn.
i dont see why the 3rd train operates at such a funny timing?
also, the Airport shuttle... is 12mins apart. journey is only 7minutes, means the trains park at Airport for 4-6minutes. They should cut down the parking and bring down the frequency, especially peak hours
btw, I'm taking CGA shuttle everyday peak hours. only 2 trains. most of the time is (the white colour) trains
Originally posted by Samuel Lee:Actually yes, CGA and MRB uses Scissors, just like Dhoby Ghaut CCL.
MRB not scissiors.
it is more like a
|\|
| |
|/|
cross
for CGA and DBG(CCL)
| |
|X|
| |
maybe for MRP
is
|\|
| |
|/|
Temporary Road Diversion along Marina Coastal Drive |
To facilitate the construction of the North South Line Extension, the Land Transport Authority will be temporarily diverting the stretch of Marina Coastal Drive between lamp post no. 9 (adjacent to the Marina Coastal Expressway Project) and Marina South Pier building from 7 am on Thursday, 13 May 2010. The existing bus stop in front of Marina South Pier will not be affected by the temporary road diversion. The temporary road diversion is expected to remain in place till December 2010. Directional and information signs will be placed along Marina Coastal Drive and at the bus stop to inform and guide motorists and commuters. Please refer to the attached map for more information. Should motorists have any queries, they can contact the LTA hotline at 1800-CALL LTA. |
Link: http://app.lta.gov.sg/announce_content.asp?start=2koqvhxmo59t9u87a9m02pqd9euh9v8x12nvtxs547df9vv02v
Wondering got open house anot :D
Originally posted by willis_chong:MRB not scissiors.
scissors. Zoom into the image it is an 'X' figure.
Originally posted by Samuel Lee:Actually yes, CGA and MRB uses Scissors, just like Dhoby Ghaut CCL.
CGA is scissors, but MRB is tandem.
Originally posted by SBS8214Z:scissors. Zoom into the image it is an 'X' figure.
we are talking about the current Marina Bay station crossover, which is a tandem. for the one after Marina Pier, the diagram shows a scissors.
Wow. NS28 have updated in Wikipedia.
http://en.wikipedia.org/wiki/Marina_Pier_MRT_Station