Shortest door opening period(Doors Open and close)
Originally posted by willis_chong:Records that trains achieved!
Fastest Doors Opening
049/050 - 1.5 secondsSlowest Doors Opening
None yetFastest Doors Closing
097/098 - 1.25 secondsSlowest Doors Closing
049/050 - 5 seconds
227/228 - 5 secondsLongest STARIS Installation
009/010 - No VFDs for 2 months (Oct 2009 to now)Longest time STARIS took to operate since installation
001/002 - Operation after 4 months (Mar 2009 to Jul 2009)Shortest time STARIS took to operate since installation
051/052 - Operation after 7 daysTrain missing for the longest time
089/090 - 4 months (Aug 2009 to now)Most unique train
237/238 - Many unique things in one train (modified grab poles, extra poles, new flooring)Train with weirdest motor sound
047/048Train with loudest "mosquito sound"
099/100
227/228 also have slow opening doors.
Originally posted by Veyron16.4:Shortest door opening period(Doors Open and close)
Sorry, cannot be considered since it depends on the TO, not on the train.
119/120- most number of ext ad after refurbishment
323/324- another C751b with violent doors
Originally posted by smrt3099:119/120- most number of ext ad after refurbishment
323/324- another C751b with violent doors
1324 door A1/B1 also close as fast as 3098 A4 and B4 doors. Have a vid of it.
093/094 and 097/98 has the longest time having the ext ad
227/228 is the king of CGL the runs consectively for 4 weeks without a change
Originally posted by smrt3099:093/094 and 097/98 has the longest time having the ext ad
227/228 is the king of CGL the runs consectively for 4 weeks without a change
Erm, I took 227/228 on NSL on 22/11/09. Do you mean 237/238?
Add a "Slowest STARIS synchronisation"
It is for those trains whose STARIS is too slow to catch up with the train.
E.g. VFD shows EW25 Chinese Garden at EW26 Lakeside.
New record:
093/094 - Longest ad period (SE), 31/12 - 24/07, 7 months 25 days.
Originally posted by yongjianrong:Add a "Slowest STARIS synchronisation"
It is for those trains whose STARIS is too slow to catch up with the train.
E.g. VFD shows EW25 Chinese Garden at EW26 Lakeside.
Not valid because STARIS can malfunction anytime, anywhere.
Originally posted by yongjianrong:Erm, I took 227/228 on NSL on 22/11/09. Do you mean 237/238?
227/228 did CGL for the entire month of July 2009... without a change
031/032 broke the record of having operated STARIS suddenly
which trainset is 1st one to get refurbished?
Originally posted by Khairiano:which trainset is 1st one to get refurbished?
005/006.
ARGH why are my posts so ignored??? ):
Originally posted by Veyron16.4:Shortest door opening period(Doors Open and close)
This, worst 109/110
http://www.youtube.com/watch?v=JvuAthkDDqA (Shortest Door Opening at Pioneer)
The list has been updated with advert records!
I shall add this info in SgWiki as well.
Nobody Cares my post!!!
227/228 is the CGL record broker that runs for consectively for 4 weeks in the month of July 2009 without even a single change. Thats Y is called the KING
Originally posted by smrt3099:Nobody Cares my post!!!
227/228 is the CGL record broker that runs for consectively for 4 weeks in the month of July 2009 without even a single change. Thats Y is called the KING
Originally posted by smrt3099:Nobody Cares my post!!!
227/228 is the CGL record broker that runs for consectively for 4 weeks in the month of July 2009 without even a single change. Thats Y is called the KING
Cannot like that la.
I doubt you go to CGL everyday for that 4 week period? Even including Staurdays and Sundays?
003/004 have slow closing doors about 4-5 secs.
Shortest ad period - Tentera Singapura (2 weeks)
Originally posted by Bus and Train LoVuR:Shortest ad period - Tentera Singapura (2 weeks)
It is already there.
Similar record:
121/122, JobCentral window ad, 2 weeks also
Originally posted by BiminiRosy:This, worst 109/110
http://www.youtube.com/watch?v=JvuAthkDDqA (Shortest Door Opening at Pioneer)
This is SO common at stations without many people, like Khatib and as in your video Pioneer (and many others), especially on weekends. 20 seconds and train's gone.
Redhill gets the record for being the most unique station:
A Trapezium layout!