Originally posted by ---Max---:I will stop any unpleasant incident with user 'dkcx'. I will be going to london and people over there are much muture. I will change for the better and be more mature in the way I think. As for dkcx, after reviewing the past post, I realised that me and you are very childlish. For me, I think it is still forgivable but for you at the age of 20+, I think this is not very pleasant...
Who cares about age? Open your eyes and you see alot of ppl behaving childish on forums. Important is we can behave well in real life, get our jobs done and earn the respect we earn from people that we need to.
please grow up people, what does your darn age have anything to do with 1.5M PSDs anyway
To Max: Which part of the roof? I went and see and nothing's different. :\
Anyway the PSDs is made by Singapore Technology, so if you want to see how it look like.
ZhongXiao Fuxing Station, PSD from Singapore Technology, the blue colour ontop denotes the line colour. There is also another one installed on Taipei Main Station.
Originally posted by SBSTransport:Anyway the PSDs is made by Singapore Technology, so if you want to see how it look like.
ZhongXiao Fuxing Station, PSD from Singapore Technology, the blue colour ontop denotes the line colour. There is also another one installed on Taipei Main Station.
All major stations there have it...i.e. interchanges.
but usually some sattions were already very hot and not windy even without the PSDs
Jurong East has the new flooring at platform C/D only.
now i can see the jurong east has aready the yellowblack strips like yishun's ang pasir ris's ones. and just now at lakeside and boon lay have a tape with numbers at the yellow line, will they also start to do 1.5 PSD?
edit spelling: and
this is the sticker that i mention.. taken at eastbound plaform of lakeside station as you can see it with number 17, could it be PSD door number 17?
Originally posted by Khairiano:this is the sticker that i mention.. taken at eastbound plaform of lakeside station as you can see it with number 17, could it be PSD door number 17?
Highly possible. If not why is the number over there?
BTW is there any progress at any other stations?
Originally posted by ---Max---:Highly possible. If not why is the number over there?
BTW is there any progress at any other stations?
boon lay also got..
while at JE, some of the platform got yellowblack strips
AMK also seen with numbers on yellow lines
It seems that things are moving fast...
yeap. dunnoe bout the eastern part..
this is at jurong east westbound platform..
Originally posted by Khairiano:this is at jurong east westbound platform..
Northbound platform got new flooring?
Originally posted by Bus and Train LoVuR:Northbound platform got new flooring?
Originally posted by Khairiano:
almost 1 northbound(eastbound side) platform got aready
The platform facing the westbound platform hasn't got it , right?
Originally posted by Bus and Train LoVuR:The platform facing the westbound platform hasn't got it , right?
yeap..
Originally posted by Khairiano:
yeap..
So only 2 platforms has new flooring?
Originally posted by Bus and Train LoVuR:So only 2 platforms has new flooring?
yes..
Now at Jurong East Middle Platform have black yellow stripes..
taken at Middle platform (westbound Island platform)
Updates at Pasir Ris :
Both platforms A and B had another new flooring, the new flooring looks like the old one but smaller and placed only at the sides were the train doors are (When the train is at the platoform).
The new 1.5m PSDs has been revealed! It looks very similar to the circle line full height platform screen doors especially the arrows, just that it's half height. Sorry no picture taken. Anyway, those who want to take a look at the 1.5m PSD, its at Pasir Ris MRT station concourse level, beside the down riding escalator stairs, its there.
I believe that installation would take place very very soon!
Finally :D
Originally posted by Nathpoop:Updates at Pasir Ris :
Both platforms A and B had another new flooring, the new flooring looks like the old one but smaller and placed only at the sides were the train doors are (When the train is at the platoform).
The new 1.5m PSDs has been revealed! It looks very similar to the circle line full height platform screen doors especially the arrows, just that it's half height. Sorry no picture taken. Anyway, those who want to take a look at the 1.5m PSD, its at Pasir Ris MRT station concourse level, beside the down riding escalator stairs, its there.
I believe that installation would take place very very soon!
Finally :D
Also found in Yishun! Check them out!
Originally posted by willis_chong:Also found in Yishun! Check them out!
i saw them too at Yishun just now =)