Yeah!!!! Yishun HHPSD Is Finally Working!! No Errors Unlike On The Day Pasir Ris's HHPSD Operated
Originally posted by Glenchua2005:Yeah!!!! Yishun HHPSD Is Finally Working!! No Errors Unlike On The Day Pasir Ris's HHPSD Operated
There is minor errors with the PSD but definitely better than the PSR's ones.
60:40 Door
Originally posted by wenjie639:60:40 Door
And the PSDS not really looks like the same as PSR.
Originally posted by BiminiRosy:And the PSDS not really looks like the same as PSR.
...it's exactly the same.
Originally posted by willis_chong:...it's exactly the same.
I mean the height and length....
Originally posted by BiminiRosy:I mean the height and length....
It's the same as well.
Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms
1. PSR - 54 (LIVE as of 01/11/09)
2. YIS - 54 (LIVE as of 02/12/09)
3. JUR - 106 (27 + 27 + 26 + 26)
Were you on a C651 when you took pictures of the HHPSDs?
Originally posted by Kawasaki C751B:Were you on a C651 when you took pictures of the HHPSDs?
It is obvious that he was on a C651 when he took the pictures. Look at the reflections on the HHPSDs.
What trainset?
Originally posted by wenjie639:60:40 Door
wtf.
03/12/09:
Yishun's HHPSD had a problem.
It was on the southbound platform and door 1 had a problem. The funny part was, the indian worker was sitting beside the door. Then, whenever a train arrives, he would stand up and signal people to use the other door. He signaled me to use the other door though I was just standing by the door (no intention of alighting) and just finished filming a video to Yishun. After a while, the TO came out to take a look and went back in. Luckily he didn't see me filming.
Originally posted by wenjie639:60:40 Door
Uniquely Singapore...........
Originally posted by yongjianrong:03/12/09:
Yishun's HHPSD had a problem.
It was on the southbound platform and door 1 had a problem. The funny part was, the indian worker was sitting beside the door. Then, whenever a train arrives, he would stand up and signal people to use the other door. He signaled me to use the other door though I was just standing by the door (no intention of alighting) and just finished filming a video to Yishun. After a while, the TO came out to take a look and went back in. Luckily he didn't see me filming.
95% chance TOs won't scold you, 95% chance CSOs will scold you. :P
2nd post:
After some thoughts, I think I'm referring to the same door as you (wenjie639). Today it is closed with two stripes of the red and white tape and an Indian worker.
Originally posted by willis_chong:95% chance TOs won't scold you, 95% chance CSOs will scold you. :P
CSO are the ones standing at the station and watching around?
Originally posted by willis_chong:Confirmed by Interception_7, SBS7322B, and wenjie639 - Yishun PSDs working today.
i got a shock that morning...when on 081/082 heading to Bishan..
After Jurong East PSD working like Yishun and Pasir Ris, Guess which station will be the next to install the PSDs??
i Guess Clementi, Bukit Batok or Chinese Garden
I guess Tanah Merah.
Originally posted by wenjie639:60:40 Door
I would prefer the MTR style like this:
It's a folding door, like some HDB lifts or toilet doors. Essentially it's 50:25:25.
Originally posted by NickL_C151:I would prefer the MTR style like this:
It's a folding door, like some HDB lifts or toilet doors. Essentially it's 50:25:25.
That's what I expected... but apparently they didn't use this method.
Originally posted by willis_chong:95% chance TOs won't scold you, 95% chance CSOs will scold you. :P
Female CSO will ask you questions if you stay at the station for too long but male CSO don't really bother.
Originally posted by Bus and Train LoVuR:Female CSO will ask you questions if you stay at the station for too long but male CSO don't really bother.
Really? Never got that before.