Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms
1. PSR - 52 (26 + 26)
2. YIS - 48 (24 + 24)
3. JUR - 56 (23 + 23+ 10 + 0)
Originally posted by Khairiano:
ouh.. okey.. will double check tommorow
Thanks!
Originally posted by Bus and Train LoVuR:Thanks!
you welcome, can give me ur number so that i can give the updates ?
Originally posted by Khairiano:
you welcome, can give me ur number so that i can give the updates ?
Alright. Check PM.
Yishun PSDs have red stickers already, both sides.
will take a look soon (:
UPDATE : platform B and D both have 23 PSD sets each.
UPDATED =)
heavy storm in the morning.. 23 sets both platforms..
Originally posted by Khairiano:UPDATED =)
heavy storm in the morning.. 23 sets both platforms..
Thanks. Tomorrow platform C should have about 3-4 sets already.
JUR has been installed 46 PSDs already!!
Originally posted by BiminiRosy:JUR has been installed 46 PSDs already!!
Time passes very fast.
Originally posted by Bus and Train LoVuR:Thanks. Tomorrow platform C should have about 3-4 sets already.
yeah.. every weekdays i will check =)
Originally posted by BiminiRosy:JUR has been installed 46 PSDs already!!
Whoa, now we need to stand at the other platform to do train spotting :(
Here's the PSD features.
Pasir Ris green stickers on PSDs are removed! Don't know why though.
Originally posted by Khairiano:Installation of half-height PSDs in above-ground MRT stations
Total of 54 sets for stns with 2 platforms, and 108 sets for stns with 4 platforms1. PSR - 52 (26 + 26)
2. YIS - 48 (24 + 24)
3. JUR - 46 (23 + 23+ 0 + 0)
lol the top line can simplify to "27 sets per platform" lol
Originally posted by jayh272416:lol the top line can simplify to "27 sets per platform" lol
Don't need.
i have only one thing to "say" when i saw all those PSDs at jurong east today.
NO WAY!!!HOW THIS HAPPEN?
NNNOOOOOOOO!
btw there is actually a truck that deliever those glass panels.
While I was at Yishun today, I noticed that they put up a glass panel at the end, which make me wonder wouldn't it be nicer to remove all the metal bars and replace it with a glass & glass door. As the extra glass panel looks redudant to me.
I was wondering how it will look like in the future if all the surface station were to install PSD & take pictures of trains. I don't really like the weird shadow formed & the front has been blocked.
i dun like the design of HHPSD currently.. cant have ext no. view
Originally posted by smrt3099:i dun like the design of HHPSD currently.. cant have ext no. view
I also don't like , cannot see the trainset no.
UPDATE: platform C got 10 PSD aready
PSR's PSD is doing some test , whether it can open and close or not.
How many PSDs installed in one day at JUR?