Please update in Page 13 Post
Installation of half-height PSDs in above-ground MRT stations
1. PSR - 49.5 (25 + 24.5)
2. YIS - 48 (24 + 24)
3. JUR - 16 (12 + 4 + 0 + 0)
Originally posted by Khairiano:Installation of half-height PSDs in above-ground MRT stations
1. PSR - 48.5 (24.5 + 24)
2. YIS - 48 (24 + 24)
3. JUR - 13 (9 + 4 + 0 + 0)
what do u mean by 24.5?
I thought for 24 doors there are only 23 full sets and 2 half sets.
Originally posted by jayh272416:
what do u mean by 24.5?
I thought for 24 doors there are only 23 full sets and 2 half sets.
Note: The order of the PSDs written on the list is platform A, then B, and A B C D for Jurong.
PSR has a new panel now (will upload pic later).
Not yet. They have not been fully installed.
Today's pics:
PSR
Update : JUR WB platform + 3 = 12
Originally posted by Bus and Train LoVuR:Update : JUR WB platform + 3 = 12
err.. ur maths error? its 12 or 13? 4+(6+3)=13
Originally posted by Khairiano:
err.. ur maths error? its 12 or 13? 4+(6+3)=13
I counted it already , it's 12 not 13.
Originally posted by Bus and Train LoVuR:I counted it already , it's 12 not 13.
okey, tomorrow i'll double check again..
i put as 12 ~ 13 first..
Originally posted by Khairiano:
okey, tomorrow i'll double check again..
i put as 12 ~ 13 first..
Very sorry , should be 12 PSDs sets for WB platform only and 4 PSDs set at platform C.
Originally posted by Bus and Train LoVuR:Very sorry , should be 12 PSDs sets for WB platform only and 4 PSDs set at platform C.
ouh okey.. =)
edited, neh its okey..
Originally posted by Khairiano:
Originally posted by jcqh:Note: The order of the PSDs written on the list is platform A, then B, and A B C D for Jurong.
PSR has a new panel now (will upload pic later).
Not yet. They have not been fully installed.
Today's pics:
PSR
i know.
| | | | | | | | | | | | | | | | | | | | | | | |
24 doors. There are only 23 gaps. (count them above if you want to)
the full size panels connect 2 doors. so there is one for 1-2 one for 2-3 and so on until 23-24
then the half sized ones are at the end.
Pasir Ris (07/10)
Similar to Platform B, Platform A now has the door panel at the end on the same side as Platform B.
So, 24.5 for it.
Originally posted by jcqh:Pasir Ris (07/10)
Similar to Platform B, Platform A now has the door panel at the end on the same side as Platform B.
So, 24.5 for it.
really?? i will going there tomorrow.. dats mean whole platform installed HH-PSD..
left the
- train borne wireless
- station wireless
- psd controller
- Local control panel
i believe this will fully installed by November due to the connections and will be fully operation by December .
Will the door opening track be placed at the floor as well??If not the installation wasnt quite complete..
Originally posted by smrt3099:Will the door opening track be placed at the floor as well??If not the installation wasnt quite complete..
you mean the door sliding track?
these type of doors no need the track ...
http://www.youtube.com/watch?v=ySce2NURowU&NR=1
look at the floor and see..
Update : JUR WB platform +3/4 PSD sets , total for WB 15/16 (didn't count so not sure)
and i suppose these PSDs are made by Westinghouse again...
Originally posted by nenepokey:and i suppose these PSDs are made by Westinghouse again...
Yup, correct!
Originally posted by nenepokey:and i suppose these PSDs are made by Westinghouse again...
HHPSDs are made by Westinghouse and installed by Singapore Technologies Electronics.
what about the PSD inside NEL and CGA stations???
I mean the manufacturer
Originally posted by smrt3099:what about the PSD inside NEL and CGA stations???
I mean the manufacturer
WestingHouse also
UPDATE : JUR WB platform has 18 PSD sets , still 4 on platfom C.
Originally posted by nenepokey:and i suppose these PSDs are made by Westinghouse again...
Not again!
Today any installed PSDs at JUR? Please update.
Originally posted by BiminiRosy:Today any installed PSDs at JUR? Please update.
Yes. I owning the next page.