if those tat noticed it know wat I meant
The CC station number is not even covered up on SMRT's train.. NEL train's S'goon Stn corresponding CC number is covered
As long as the station sign is not yet updated to show "NS17 CC15 Bishan", I think its ok.
is the dhoby ghaut and paya lebar covered up?
Originally posted by disappear:As long as the station sign is not yet updated to show "NS17 CC15 Bishan", I think its ok.
is the dhoby ghaut and paya lebar covered up?
all covered up except Bishan
NEL e side has indicated colour code for CCL but all e stations are covered up
lol
Slowly wait lor.
Since the (Bartley-Marymount) opening date already announced, so SMRT might as well not cover up Bishan CCL station number.
SBST NEL wait near opening date then remove
some hoardings outside the bishan station had actually removed.. or evn near the field
Scarly the CC and NSL(my imagination lah) go same platform, then die die already, must put signal, put instruction that CCL train is here, then NSL train is here, then must put pics to show which are the NSL trains and which are the CCL trains.
Originally posted by SBS8033D:Scarly the CC and NSL(my imagination lah) go same platform, then die die already, must put signal, put instruction that CCL train is here, then NSL train is here, then must put pics to show which are the NSL trains and which are the CCL trains.
Originally posted by Dark Honour:
if like that, we can have thorough service b/w CC and NSL le...=P....lol, glad bishan going to have interchange; i can go visit junction 8 on the day CC opens (my house very inconvenient to go to bishan de)
how? CC train is HALF the size of NSL de
Originally posted by SBS8033D:Scarly the CC and NSL(my imagination lah) go same platform, then die die already, must put signal, put instruction that CCL train is here, then NSL train is here, then must put pics to show which are the NSL trains and which are the CCL trains.
see UK
metropolitan line, hammersmith&city line and their circle line on same platform
Northbound has made alot of progress
Originally posted by jayh272416:see UK
metropolitan line, hammersmith&city line and their circle line on same platform
I'm going there (TUBE) soon b4 coming back to spore !!!
cant wait to take london underground
http://www.nyceparis.com/paris-city-guide/paris-subway-map.htm#
Will singapore's system become something like the Paris subway system in 20 years time?
Originally posted by charlize:http://www.nyceparis.com/paris-city-guide/paris-subway-map.htm#
Will singapore's system become something like the Paris subway system in 20 years time?
haha I would say half of that in 20 years time.
Originally posted by azharjj:
I'm going there (TUBE) soon b4 coming back to spore !!!cant wait to take london underground
haha ok
i heard it changed abit lol
the a/c has activated in NB head as well
On NSL, the stickers are removed on the CC15 sign as the opening date is this year. Perhaps NEL does not want to confuse people, so the stickers are not removed yet.
latest progress: more hoardings are in the provess of removing at the bus interchange and the staion itself in bishan, more thigns have revelaed and ppl are in curiousity, but no signs for the open house slated there
anyone knows about the new circle line?
Originally posted by nganmatthias:On NSL, the stickers are removed on the CC15 sign as the opening date is this year. Perhaps NEL does not want to confuse people, so the stickers are not removed yet.
the trains with STARIS the stations like buona vista paya lebar all not covered up
Originally posted by Tilldeath23:some hoardings outside the bishan station had actually removed.. or evn near the field
today went to bishan bus interchange. the entrance there near completion, can see from within the bus interchange
Originally posted by Dark Honour:
if like that, we can have thorough service b/w CC and NSL le...=P....lol, glad bishan going to have interchange; i can go visit junction 8 on the day CC opens (my house very inconvenient to go to bishan de)
u live in serangoon right? i think i understand what u mean....very inconvenient from serangoon....thomson plaza even more inconvenient....
Originally posted by disappear:
the trains with STARIS the stations like buona vista paya lebar all not covered up
Buona Vista and Paya Lebar will not open this year but Bishan will.
Originally posted by nganmatthias:
Buona Vista and Paya Lebar will not open this year but Bishan will.
i hope Paya Lebar will next year.