Originally posted by Dragonaxe:wWill the crossover be something like that?
Will be:
Replaced tracks marked by circles.
Originally posted by youyuan:lol, Additional tracks will be added to link bukit batok to Jurong ( towards Pasir Ris ) too. In order to lay the signal systems and tracks, Jurong East station will be closed to public for 4 weekends day. 2 in August and 2 in Sept. Trains will terminate in clementi and chinese garden for EW lines. For northsouth line, trains will stops at bukit batok. But no worries, ferry service will be link between stations by SMRT bus.
is the closure (more or less) reliable?
if it is then its the first time any segment of an operating line is having a planned closure like those in London isnt it?
and though its a weekend, it still sounds terribly disruptive.
Originally posted by deskoh91:is the closure (more or less) reliable?
if it is then its the first time any segment of an operating line is having a planned closure like those in London isnt it?
and though its a weekend, it still sounds terribly disruptive.
cant help it.
theres no way youre going to do major repair to the track with operating trains lol...
but actually from Joo Koon side i think can use JE Middle Track still.
Originally posted by jayh272416:cant help it.
theres no way youre going to do major repair to the track with operating trains lol...
but actually from Joo Koon side i think can use JE Middle Track still.
If use middle track right, must go EB tracks leh, they also replacing the tracks from the new track to the existing WB tracks
Originally posted by willis_chong:Will be:
Replaced tracks marked by circles.
Like that need one platform for termination and one for boarding right? This platform arrangement is like the mega station is Tuas Extention.
Unofficial EW29-EW30 Track Drawing! UNOFFICIAL OK!!
http://img576.imageshack.us/img576/7670/ew30.png http://img718.imageshack.us/img718/946/jknew30.png Ahhh i can't add the photo in, some bug i guess gimme a min or maybe two
Originally posted by Dragonaxe:Unofficial EW29-EW30 Track Drawing! UNOFFICIAL OK!!
Ahhh i can't add the photo in, some bug i guess gimme a min or maybe two
AH Added already
Originally posted by Dragonaxe:
1st )EW 29 - EW 30 (UNOFFICIAL)
2nd ) After EW30, if it is unclear i can make another one
Well, there are some pillars up on the platform (those that lead up to the roof's frame) now.
OK! I got a new map for EW30, Why not see if this is possible.
Originally posted by ngyk:Hi Youyuan, where did you get this information from?? is it reliable???
it is possible that they will have to close. up till now LTA or SMRT has no press release. it is almost impossible that they will close during that time because why? Big event like YOG and NDP. i got it from another forum joking abt JEMP.
Originally posted by youyuan:it is possible that they will have to close. up till now LTA or SMRT has no press release. it is almost impossible that they will close during that time because why? Big event like YOG and NDP. i got it from another forum joking abt JEMP.
Yeah, most probably they do after last train.
Originally posted by Dragonaxe:Yeah, most probably they do after last train.
Check the EW29-EW30 Crossovers? Possible?
Originally posted by Dragonaxe:Check the EW29-EW30 Crossovers? Possible?
So many crossovers for what? Waste resources.
Originally posted by Dragonaxe:OK! I got a new map for EW30, Why not see if this is possible.
3 pairs of crossovers are pointless.
Maybe use Tanah Merah the crossovers on each side?
err guys.. errr...
Then, if it has 4 parallel tracks, it doesn't justify the height of the station. On the schematic plan by LTA, it doesn't have any crossovers (Amazing right?)
Originally posted by Khairiano:err guys.. errr...
Right we know, OT
Originally posted by Khairiano:err guys.. errr...
OT...
How is the progress @ JRE?
Originally posted by Dragonaxe:How is the progress @ JRE?
here is it...
Originally posted by youyuan:here is it...
C651 in CM mode? Nice.......
So any updates in JEMP today?
Originally posted by Operation//Overkill:C651 in CM mode? Nice.......
U nvr see a C651 in CM mode before? Gosh....