uncouple 313 and let tow truck do the job? or maybe they going to try let 313 push it back to changi again?Originally posted by Oceane:Hmm... I wonder how will they tow it back since 313/314 has reached the eastern end...
Anyway never expected this maintanence train saga to be so long.
Is it. But the grilles....Originally posted by Manager433:Wrong lah. That one not radiator.
"On 21 January 2008, there were no westbound and eastbound train services between Pasir Ris and Tanah Merah MRT stations from the start of train service at 5.28am till 12.45pm.Originally posted by xunmeng:my dad says SMRT asked SBS for help and SBS deployed 30 buses to help ferry passengers between Pasir Ris and Tanah Merah MRT stations
Originally posted by ^tamago^:haven't resume yet. free transport between the 3 eastside town centres!
anyway the maint truck hit onto something (wat's there in the morning?) out of tampines WB and the front cab sunk. they just tow it back to tampines in case it rains, due to hot weather and that u can't couple and push forward cos the front smashed.
the front cab, window got crack, panel below it came off, radiator bracket hanging.
from SBST we have 982Z, 3652A, 974R, 3573U NAC.
TIB925P, 1107C, 1165J, 974Y, 1099S, 448A, 815Z, 1184D, 446E.
as i'm typing now, the maint truck being tow back to changi by 313/314.
ADD: 975U.
Originally posted by sbst275:
NAC bus deployment for bridging???
I only saw a few numbers. Dun know how to buy for Wed 4D.Originally posted by ^tamago^:Is it. But the grilles....
It was on the left undercarriage....
I believed SMRT asked SBST for help, and this was possible since they could foresee the problem right in the morning even before peak hour started and had time to take out buses necessary for this shuttle.Originally posted by Vigelic:what's NAC? non air con ah? what's so shocking abt that?
and i couldn't understand how did SBST get involved.. was it a government thing or a head of SMRT asking head of SBST for help? or SBST offered help in goodwill? or SMRT paid SBS for 30 buses or what?.
Can push, can pull what...Originally posted by Oceane:Hmm... I wonder how will they tow it back since 313/314 has reached the eastern end...
Anyway never expected this maintanence train saga to be so long.
Let's hope tonight it doesn't get stuck again... if not...Originally posted by TIB1224Y:Can push, can pull what...
Push dah fella back to Changi loh...
I just told my friend that if the cab drops off, we get more than 12 hours tomorrow.Originally posted by ^tamago^:Let's hope tonight it doesn't get stuck again... if not...
I think they used EB. I didn't take notice but:Originally posted by DMC05:Did Changi services switch platforms so that the mainline train could use the centre platform?