Alrighty, understood...Originally posted by aHGer^83:i know not suicide... but just being sacarstic abt this issue and their services...
no. maint truck being towed backwards all the way to pasir ris. tat shld do the trick.Originally posted by Dead_Man_Inc:not resume yet?
so is whole EWL line affected? or only pasir ris to tenah merah?Originally posted by ^tamago^:no. maint truck being towed backwards all the way to pasir ris. tat shld do the trick.
Yay resumed!Originally posted by ^tamago^:train bridging service available from tampines and simei to tanah meraah only by 205/206.
1080U got stuck at Tampines MRT slip road the curve there.
1124C and 1054X also tio.Originally posted by TIB1224Y:Yay resumed!
1080U this morning was at BB Int svc 61 got swapped over loh...
Lucky now KJ no need put bus in liao...
You mean this evening?Originally posted by ^tamago^:EB platform (B) of PSR not available so peak hour freq sure affected by this bottleneck. it's not like they have yishun overrun to lay over like NSL. if whole NSL turn ard at JUR also die.
1 primemover langga another lehOriginally posted by SMRT Buses:seems that another maintenance train needs to be deployed for tonight's track maintenance
ya.Originally posted by epr0mlse:You mean this evening?
Will they reduce the frequency? If they reduce frequency..Originally posted by ^tamago^:ya.
only 1 track available for turnaround.
Hmm... I wonder how will they tow it back since 313/314 has reached the eastern end...Originally posted by ^tamago^:And finally, this will be sent back later tonight after train service stops.