"Extending the Circle Line to Marina BayOriginally posted by SMRT 32373238:dont understand...
why is CCL having platforms at bayfront leh?
Originally posted by ^tamago^:So is Promenade stn gonna be like the current Tanah Maerah? with 3 tracks... 1 for a shuttle service btw promenade and bayfront?
"[b]Extending the Circle Line to Marina Bay
11. To enhance the accessibility of the Marina Bay area to the rest of the island, the CCL will be extended to Bayfront Station from Promenade Station. This will be completed in 2012."
http://app.lta.gov.sg/corp_press_content.asp?start=1763 [/b]
not too sure.. but i know paya lebar will have 3 tracks.Originally posted by SMRT 32373238:So is Promenade stn gonna be like the current Tanah Merah? with 3 tracks... 1 for a shuttle service btw promenade and bayfront?
CCL stage 4.....bt brownOriginally posted by maggot:Can ask whether have they dig up the bodies?
cool whats the 3rd track for? like AMK JUR and TNM... 3rd track to lead back to the depot?Originally posted by NickL_C151:not too sure.. but i know paya lebar will have 3 tracks.
no one knows for now, but as we can see from the floor plan.........Originally posted by SMRT 32373238:cool whats the 3rd track for? like AMK JUR and TNM... 3rd track to lead back to the depot?
i suppose its for the trains to turn back to serangoon? stage 3 will open first right? correct me if im wrong please. they should have this kind of layout at tai seng and/or bartley too, since they are closest to the depot and it'll be easier for trains to return.Originally posted by SMRT 32373238:cool whats the 3rd track for? like AMK JUR and TNM... 3rd track to lead back to the depot?
According to 2 newspaper articles in Straits Times and Lianhe Zaobao some time back last July, construction at stage 3 is the fastest, and of all interchange stations, construction at Bishan is going the most smoothly. Some days back, there was a sign along Marymount Lane saying "Marymount Road will be reinstated from 2/2/07 onwards". Now, the two station entrances are half done and the station concourse dug in the middle of the road is being covered up. If I can get pics, I will try to upload.Originally posted by NickL_C151:i suppose its for the trains to turn back to serangoon? stage 3 will open first right? correct me if im wrong please. they should have this kind of layout at tai seng and/or bartley too, since they are closest to the depot and it'll be easier for trains to return.
*edit*
oh, just to add on, the promenade station layout seems starkingly similar to BMRT stations. limited space? or same planner? since SMRT does have a share in BMRT...
take 74 NAC DD.Originally posted by 201911:According to 2 newspaper articles in Straits Times and Lianhe Zaobao some time back last July, construction at stage 3 is the fastest, and of all interchange stations, construction at Bishan is going the most smoothly. Some days back, there was a sign along Marymount Lane saying "Marymount Road will be reinstated from 2/2/07 onwards". Now, the two station entrances are half done and the station concourse dug in the middle of the road is being covered up. If I can get pics, I will try to upload.
stage3 meh? tot its stage2 tat opens 1st...Originally posted by NickL_C151:i suppose its for the trains to turn back to serangoon? stage 3 will open first right? correct me if im wrong please. they should have this kind of layout at tai seng and/or bartley too, since they are closest to the depot and it'll be easier for trains to return.
*edit*
oh, just to add on, the promenade station layout seems starkingly similar to BMRT stations. limited space? or same planner? since SMRT does have a share in BMRT...
Think BMRT is the "MRT" in Bangkok.Originally posted by SMRT 32373238:stage3 meh? tot its stage2 tat opens 1st...
wats BMRT?
Supposedly, in the near future, the LTA might extend CCL with an additional station (CC30: Shenton Way), and thus linking it to (NS27/CC31 : Marina Bay). If they do that, Marina Bay will be a station for 2 terminals. So I guess they might want to add (NS28: Marina View) so that Marina Bay will be the future terminus for CCL.Originally posted by Novawin™:I remembered it was mentioned that one more station (Marina View) will be added and extended from Marina Bay on NSL line but now no news? Or is it being replaced by Landmark station from Downtown Line?
i heard it's cos the delay caused by the collapse of nicoll highway meant they practically had no deadline to meet to complete so they literally took their own sweet time to build.Originally posted by SMRT 32373238:Is it just me or did Stage3 take so much less time to complete compared to Stage2? cos i'm very surprised to see the exits at Serangoon stn and Lorong Chuan stn to be already built... (adding on to the pleasant news abt Marymount) Didnt Stage2 stations take really long? All i rmb along the stage2 stretch was a mess for years!
actually, i don't think they want to extend the current southern terminus of NSL, marina bay to marina view, just because they want to make it the terminus for CCL. think reason is because they want to extend the mrt system to the marina view area.Originally posted by Oceane:Supposedly, in the near future, the LTA might extend CCL with an additional station (CC30: Shenton Way), and thus linking it to (NS27/CC31 : Marina Bay). If they do that, Marina Bay will be a station for 2 terminals. So I guess they might want to add (NS28: Marina View) so that Marina Bay will be the future terminus for CCL.
Now there's another sign on the other side of the road (near the Boonview condo) saying that the reinstatement for the other side of the road will begin on 8/8/07. The two station entrances are now about half done and look very nice.Originally posted by 201911:Some days back, there was a sign along Marymount Lane saying "Marymount Road will be reinstated from 2/2/07 onwards".