does the extension mean that smrt has to run a higher frequency of trains?
Not necessarily. SMRT can just add 1 more train to the line to maintain the current frequency.
What about those new C151A's :D
Originally posted by Stage:What about those new C151A's :D
Tender haven't close yet, even the C951 haven't even announce who won.
Originally posted by NickL_C151:Not necessarily. SMRT can just add 1 more train to the line to maintain the current frequency.
then they'll make a big hooha about it!
"SMRT adds 18 more train trips!!!!" (consider one train doing full day 6am-12am)
Originally posted by sinicker:then they'll make a big hooha about it!
"SMRT adds 18 more train trips!!!!" (consider one train doing full day 6am-12am)
sekali on Sunday do alternate trips
for every 3 trains, 2 would terminate at Pioneer, one would terminate at Joo Koon
Originally posted by sbst275:
sekali on Sunday do alternate tripsfor every 3 trains, 2 would terminate at Pioneer, one would terminate at Joo Koon
Sunday can do 30-min shuttle frm Boon Lay to Joo Koon lah.
Originally posted by sinicker:Sunday can do 30-min shuttle frm Boon Lay to Joo Koon lah.
maybe
I'm thinking weekday off peak maybe would kena also
Originally posted by sinicker:Sunday can do 30-min shuttle frm Boon Lay to Joo Koon lah.
Then later langa
MRT's Boon Lay extension to start operating from 28 Feb 2009
SINGAPORE: The Boon Lay extension of the Mass Rapid Transit system will start operating from February 28 next year.
The 3.8-kilometre stretch along the East-West Line will consist of two stations - Pioneer and Joo Koon.
The Land Transport Authority says this will benefit Jurong West
residents as well as those working in the Jurong Industrial estate.
Their travelling time is expected to be cut by as much as 15 minutes.
The extension will also give commuters direct access to the MRT system.
They currently have to make bus transfers at Boon Lay station.
- CNA/ir
knn they originally say wad propose by december one leh
now they everyday doing train testing
den keep hear, 'dear passengers, for your own safety, please stand behind the yellow line'
they say got let public test the train today from pioneer to joo koon and back
and super super many people,
got lay carpet and minister come somemore
22 new batch of trains purchased by SMRT will be on revenue service 2011. this news report has mentioned on Channel 8 6.30pm News alrdy.
Is it driver-less train? I hope so!! Cause generation is changing day by day!
no.
Aww so sad. If SBST transit train are why not SMRT? maybe becoz it is above ground...
deleted.
cannot wait to take the train to my work place liao!! wakakaka!!
take train from lakeside den alight at joo koon, den reach aready, just infront of station sampai aready.. Union Containers Pte. Ltd. hahas.. no need to change change bus anymore..
yahoo!
Hahaha. SBST is gonna lose some money from those ppl that transfer at BL INT.
Originally posted by SBS8316M:Is it driver-less train? I hope so!! Cause generation is changing day by day!
Not possible although NSL / EWL train is on automatic mode. If you want all train to be entirely driverless, the cost to upgrade the existing infrastructure to accomodate such major changes is very hefty. More and more computers are required for controlling driverless train without the driver onboard.
BUMP!
pictures taken today
MRT track viewed from Boon Lay station
new MRT viaduct, together with new bus stop after reinstatement of pavement
Pioneer station
staircase from platform level to ground level is more or less complete
information board informing nearby residents about the mrt works. such displays can also be found @ circle line mrt station
lift access
viewed from a nearby carpark
project details
viaduct between Pioneer and Joo Koon
dark skies
Joo Koon station. it had already started raining, but u cant see the raindrops yet
a station exit, to be linked to a bus stop
close up. taken some time later, hence you can see the rain
bus stop under construction
and the rain has gotten bigger
the track ends here for now... a 14km extension towards Tuas has been planned, scheduled to be completed in 2015, i think
where the bus stop would be on the other side of the road
another station exit on the other side of the road. there are 3 in total at Joo Koon station
road reinstatement completing soon
view of the entire station
visit my photostream here, for more photos: