Track laying
Waiting for the tracks
The Tracks
finally they are laying tracks.
Got the latest photos of Pioneer Station?
The connection of the track to bef the Blk 658 MSCP was done during last night.
A large mobile crane was used to lift up the tracks to complete the track connection.
Sorry, didn't take pics...
wah!
when happened de?
den nw th interchange go whr le?
oh oh oh.
paiseh paiseh.
juz realised dis thread in 2006 de.
The overhead bridge on Westbound side is up.
The escalator/stairs & lift shaft are also ready for the same side.
The Casting Yard also become area of stones & behind it is for making the tracks.
How's the progress going on at Joo Koon station?
When will these 2 new stations start operations? Anyone know?
Originally posted by Manager433:When will these 2 new stations start operations? Anyone know?
LTA said they will be opened in 2009.
Will it be something like the Changi Airport Extention where passenger will have to change trains to go to Joo Koon or a direct service without changing trains at Boon Lay?
Originally posted by I miss old annoucements:Will it be something like the Changi Airport Extention where passenger will have to change trains to go to Joo Koon or a direct service without changing trains at Boon Lay?
no. it's like at one point of time trains only ran from jurong east to choa chu kang...
suddenly the next day it runs from jurong east to marina bay.
Originally posted by I miss old annoucements:Will it be something like the Changi Airport Extention where passenger will have to change trains to go to Joo Koon or a direct service without changing trains at Boon Lay?
They should hurry up with the building of the extension. Boon lay mrt station is the most busy, crowded and disgusting station currently.
Originally posted by Novawin™:How's the progress going on at Joo Koon station?
Roof up, now for the interior, overhead bridge
For the tracks :
Fill up holes along the tracks, conecting the wirings.
Originally posted by brotherchen1982:Roof up, now for the interior, overhead bridge
For the tracks :
Fill up holes along the tracks, conecting the wirings.
At Joo Koon... has the extention beyond Joo Koon (that keeps the train on the track in case of emergency instead of it simply derailing and hitting a car underneth) been completed yet?
Deli Loco with 3 Hopper Wagons (loaded with gravel) spotted on the Eastbound Track near to Jurong West Sports Complex last week. Not sure if it's still there.
Originally posted by tintinspartan:Deli Loco with 3 Hopper Wagons (loaded with gravel) spotted on the Eastbound Track near to Jurong West Sports Complex last week. Not sure if it's still there.
Still there cos not all parts of tracks are filled up with gravel
Anyone knows what is this machine???
When the machines meet each other...
Overhead Bridge(Westbound) with shops under construction
Blur pic due to rain...
The base of the faregates also ready.
Originally posted by brotherchen1982:
Overhead Bridge(Westbound) with shops under construction
What is the roof of the platform made of? Glasses or concrete?