2010.Originally posted by Pitot:So when is the estimated completion date for CCL?
wtf. push back by 3 years?Originally posted by ^tamago^:2010.
train no use horsepower de lah.Originally posted by gasband:so this one how many horsepower?
0-100 how many seconds?
Can modify exhaust one or not?
cant they just like open it by the original date and keep tat section close?Originally posted by gasband:ya lah becos of the nicoll highway incident
hoping stage 2 (and eventually stags 3, 4 and 5) can open first. technically possible anyways.Originally posted by Pitot:wtf. push back by 3 years?
tats wad i meant man. den KPE completion date is when ar?Originally posted by ^tamago^:hoping stage 2 (and eventually stags 3, 4 and 5) can open first. technically possible anyways.
2008 bah. they're doing quite fast actually, but paya lebar side is a mess as they're supposed to finish together de.Originally posted by Pitot:tats wad i meant man. den KPE completion date is when ar?
its a nightmare to drive on Paya lebar road. up down left right.Originally posted by ^tamago^:2008 bah. they're doing quite fast actually, but paya lebar side is a mess as they're supposed to finish together de.
Originally posted by Pitot:its a nightmare to drive on Paya lebar road. up down left right.
hes just being sarcastic... umust reply like dis next timeOriginally posted by ^tamago^:train no use horsepower de lah.
typically 0-60 in 22 seconds.
trains use traction motors de, not the choo choo train wor~
heat from the engine is drown away by large exhaust fans installed in the tunnels. aboveground, heat is exhausted naturally.
yishun to city hall in 1 minute...Originally posted by SBS9828X:hes just being sarcastic... umust reply like dis next time
1001hp... engine borrow from veryon
hamman quad exhaust with chrome finish... at the rear got spoiler also
actually nothing. no seats done up yet. tat's why photographer didn't take, say it's not meaningful...Originally posted by SBS9889U:How does the interior look like?
The interior photos would then be nostalgic when CCL OpensOriginally posted by ^tamago^:actually nothing. no seats done up yet. tat's why photographer didn't take, say it's not meaningful...
Originally posted by sbst275:1 of them on the news today
LTA expects 50,000 passengers on the 44km CCL when it fully opens
no seats?Originally posted by ^tamago^:actually nothing. no seats done up yet. tat's why photographer didn't take, say it's not meaningful...