SMRT has started replacing the "to Joo Koon (2)" signs at East West Line stations with the new "to Tuas Link (2)" sign.
The "to Joo Koon (2)" is still there, but as a sticker covering the new sign.
Previously, I predicted that the Tuas West Extension may open on 16 April (Sunday).
If my prediction is correct, the announcement should be made next week (16 March, Thursday).
Originally posted by gekpohboy:SMRT has started replacing the "to Joo Koon (2)" signs at East West Line stations with the new "to Tuas Link (2)" sign.
The "to Joo Koon (2)" is still there, but as a sticker covering the new sign.
Previously, I predicted that the Tuas West Extension may open on 16 April (Sunday).
If my prediction is correct, the announcement should be made next week (16 March, Thursday).
Dude, go prepare for your NS rather than making multiple predictions one after another. TWE will definitely open by the end of June, just wait it out. Don't need to be so hyper-excited. Unless you are a direct beneficiary who commutes on it everyday after it opens.
TTS;The addition of 12.8m MAN A95 DD
SBST;The shocking lowest bidding of $480m
SMRT;Again,The first to get the facelift A95.
GAS;Again and again the same
Originally posted by gekpohboy:Honestly, I have a feeling this time round SBS Transit will get it, given that it has 44 years of experience, and it offered the lowest price.
Lowest bid doesnt guarantee anything yet,BCM is all about adhering to LTA needs not by experience.Hope you get that.If not the first two contracts will goes to SBST/SMRT instead.
There is a training bus at 9.05pm past by from Tampines ave 10 toward bedok north Rd toward bedok north Ave 1
Originally posted by gekpohboy:If my prediction is correct, tomorrow morning they will announce the opening date of Tuas West MRT stations. At the same time, although unlikely, they may also announce Jurong Region Line as part of the “package”.
Which star constellation did u look at? Maybe can enlighten us? If its there then nxt time we can rely on u to interpret stars alr ;)
Originally posted by CZT:Which star constellation did u look at? Maybe can enlighten us? If its there then nxt time we can rely on u to interpret stars alr ;)
He see star star, on top of him.
Originally posted by SMB145B:He see star star, on top of him.
Originally posted by carbikebus:Lowest bid doesnt guarantee anything yet,BCM is all about adhering to LTA needs not by experience.Hope you get that.If not the first two contracts will goes to SBST/SMRT instead.
Originally posted by No_10_Tomas:
You mean to say, SBS Transit did not get it?
And considering you are from SMRT, I suppose SMRT got it this time.
We are talking about which PTO can best manage Yishun and AMK feeder service and some key trunk services like 24, 70, 76, 130, 133, 135, 851, 852
Can you imagine the disappearance of bendy on Yishun feeder/intratown and use of B9TL
U listen twinkle twinkle little star too much bro
Originally posted by gekpohboy:Actually, it’s based on calculation. If I’m not wrong, the current train fleet started testing at around mid-February. Back then when Pioneer Joo Koon opened, trains tested around two months before opening. So, based on that, if testing began in mid-February, by mid-April the stations should open already. That’s how my prediction came about. It’s based on past observations. Those who witnessed Marina South Pier opening in 2014 may also have similar calculations. Tuas West Extension opening soon. I know the “June opening” information is from the SMRT platform staff, because got one of them also tell me that the stations will open in June. I believe that’s to mislead people, for whatever reason, probably because they don’t want people to guess correctly the date. April opening is quite likely. The best period is after Good Friday and before Labour Day. Plus some buffer for breakdown during the initial period, the best possible opening date is actually around 16 April.
Boi ah, its great that u have good observation skill, but u know a lot of us has already grown tired of the LTA waiting game (like the case of compassvale int), so for ppl like me i wont look forward to its opening till june. In fact for now we rather spend time keeping a lookout of the Seletar package winner (and again another waiting game)
To gay poh: boy ah, medicine take already not?
To others: And yeah complains about singlish again lor.
April alr.
Seletar package winner still unannounced. TS3 route details unannounced (though i feel it will be released at a much later date with TS6 to make press release easier?). Will the service 68 that was discussed previously be rolled out this month? Hopefully all these 3 things will come true in april, if not we must wait and wait and wait >:(
Other than Seletar package, LTA is going to announce bus tender. Any ideas when?
Originally posted by ND323F:Other than Seletar package, LTA is going to announce bus tender. Any ideas when?
What bus tender?Those 50 Hybrid and 60 electric buses or the Bukit Merah package in June?
Originally posted by No_10_Tomas:
We are talking about which PTO can best manage Yishun and AMK feeder service and some key trunk services like 24, 70, 76, 130, 133, 135, 851, 852
Can you imagine the disappearance of bendy on Yishun feeder/intratown and use of B9TL
new operator might see bendies
Originally posted by hgdep103:new operator might see bendies
your april fool joke is long overdue.
Originally posted by SMB145B:your april fool joke is long overdue.
we shall see who will have the last laugh