Just beside the old one with an access road with proper sawtooth parkings..
Hi mr carbikebus, any new services for this terminal? Cheers.
Originally posted by carbikebus:Just beside the old one with an access road with proper sawtooth parkings..
Is this your suggestion or press release news?
Today in use, but still see few buses rather park outside... lol
...
All, in online news today. Cheers.
Link?
Sorry. Not official online news released by authorities. But rather an online feedback of marina centre coach park which looks like the new marina centre bus terminal feedbacked by a reader. Cheers.
The coach park is just beside the new terminal..
The picture of the new terminal is in the BIS fb page. Basically it's a proper parking spot for buses loacted under Sheares Ave & Beside Raffles Blvd, nothing much.
I just passed by the new terminal on my way to airport. The new terminal is to the north of the old one, before the bridges. Only SBST is using the terminal for now, SMRT still roadside parking. Could see parking lots and an SBST office at the entrance
SMRT will follow soon later as i believe LTA wont encourage roadside parking anymore..Excluding Ghim Moh/Taman Jurong
should bulid a CBD air-con bus interchange with both Shenton Way terminal and marina centre terminal combine and have a few feeder bus service looping in the city
Originally posted by wsy1234:should bulid a CBD air-con bus interchange with both Shenton Way terminal and marina centre terminal combine and have a few feeder bus service looping in the city
There is already a planned Marina South Bus int located near MSP Mrt. Most likely Shenton Way services will shift there once the int is open somewhere around 2020.
Originally posted by Marvel68:There is already a planned Marina South Bus int located near MSP Mrt. Most likely Shenton Way services will shift there once the int is open somewhere around 2020.
i think it too far from the city area. Marina centre will be better already have MRT station nearby. all LTA is to do is to bulid a interchange there with link to the MRT. take less than 1 year to do it.
Its a pity that LTA doesnt want a full PTOs bus terminal else can introduce more new service there..Can just built a proper resting area for the BCs too..
Originally posted by carbikebus:SMRT will follow soon later as i believe LTA wont encourage roadside parking anymore..Excluding Ghim Moh/Taman Jurong
Taman Jurong considered road side even though there's parking slot(a bus bay) for the buses?
Originally posted by TIB429E:Taman Jurong considered road side even though there's parking slot(a bus bay) for the buses?
Taman Jurong Bus Terminal has three bus parking lots along Hu Ching Road, facing the new HDB flats. Along the road, there is one container office and one (or two) portable toilet.
Along the road facing the school, we can construct new parking lots, to accomodate one more bus service.
Originally posted by JurongWestresident:Taman Jurong Bus Terminal has three bus parking lots along Hu Ching Road, facing the new HDB flats. Along the road, there is one container office and one (or two) portable toilet.
Along the road facing the school, we can construct new parking lots, to accomodate one more bus service.
Hmm I tot there's like "turn in" bus bay like most of our bus stops? And not park at the side of the road? o_O
Originally posted by TIB429E:Hmm I tot there's like "turn in" bus bay like most of our bus stops? And not park at the side of the road? o_O
that's why I say "construct". pardon me for the wrong use of words. anyway, it's the same thing, right?
Originally posted by JurongWestresident:that's why I say "construct". pardon me for the wrong use of words. anyway, it's the same thing, right?
Hmm I guess so..even I myself also unsure which word to describe it haha
Originally posted by JurongWestresident:Taman Jurong Bus Terminal has three bus parking lots along Hu Ching Road, facing the new HDB flats. Along the road, there is one container office and one (or two) portable toilet.
Along the road facing the school, we can construct new parking lots, to accomodate one more bus service.
Taman Jurong can shift to another location along Yuan Ching Rd there..
49 extending to JE soon, thus freeing up the whole Taman Jurong Ter for 1-2 services. However there are plans to demolish the whole Taman Jurong Ter
....
Originally posted by TIB1112L:49 extending to JE soon, thus freeing up the whole Taman Jurong Ter for 1-2 services. However there are plans to demolish the whole Taman Jurong Ter
... the terminus is bulit very recently. to demolish it is like wasting taxpayer money. Jurong East Interchange is full.