Originally posted by SMB66X:168's getting different BSEP Wrights each day afaik, first was 3336, then 3354
3336M i nvr get to catch. Izit on 6316B timing? I believe 3354K is a full day BSEP fleet add bcoz ytd i saw it at 2.30pm at WRI. Just now i saw it at 1.20pm at Giants Tampines. So full day or split shift?
Originally posted by TIB 585L:3336M i nvr get to catch. Izit on 6316B timing? I believe 3354K is a full day BSEP fleet add bcoz ytd i saw it at 2.30pm at WRI. Just now i saw it at 1.20pm at Giants Tampines. So full day or split shift?
If I'm not wrong, it's on 6316B timing. And 6316B's timing should be full day bah?
Originally posted by SMB66X:If I'm not wrong, it's on 6316B timing. And 6316B's timing should be full day bah?
6316B last time wasnt full day, it was a split bus. Normally start at 3 and end around 7.30-8pm if im not wrong coz i have never see 6316B at night after 9pm before
Originally posted by carbikebus:Aiyo bro u don't know meh?If trunk can charge stage fares if feeder flat fare leh
Yes bro, but does it make sense!!? How can 240 be a feeder when it connects Lakeside, Taman Jurong, Boon Lay areas and 181 not when it just connects Jurong West Ave 3 to Boon Lay?
There needs to be some consistency.
179 / 199 is trunk because it connects Boon Lay to NTU, and 241 is feeder even if it connects Pioneer, Jurong St 91 and still 181 is also trunk!?!
SBS3336M is back on 168 today.
Lol, no wonder.
Earlier this month I saw 9810X perfoming on 31 and the EDS doesn't even look abit like transit media. I thought that I was seeing things because I didn't had a good sleep the night before.
Seriously have Lecip eds
Originally posted by carbikebus:Aiyo bro u don't know meh?If trunk can charge stage fares if feeder flat fare leh
Originally posted by SBS 6078 M:Lol, no wonder.
Earlier this month I saw 9810X perfoming on 31 and the EDS doesn't even look abit like transit media. I thought that I was seeing things because I didn't had a good sleep the night before.
Seriously have Lecip eds
It got reformatted. Best way to confirm it is to board the bus and look at the EDS control unit. Anyways where and when did you spot SBS9810X?
Originally posted by SBS9C:It got reformatted. Best way to confirm it is to board the bus and look at the EDS control unit. Anyways where and when did you spot SBS9810X?
At the first bus-stop when it departed TPY Int, 1 June 2013, around 3pm.
Of all the new services, according to me
4
20
50
116
120
141 - cannot be said for now
860 (need 1-2 more buses)
Sometimes history is not what we've been told nigger
Now Sv58 become CT8/CT18/CT28 ar?
Note: This is true, not some bugs by SBST Iris.
When is Hougang Central Bus Interchange going to be an Air-Condition Bus Interchange?
Originally posted by SBS 6238T:When is Hougang Central Bus Interchange going to be an Air-Condition Bus Interchange?
In 2017 or earlier as stated by the blueprint showcased a couple of years ago outside Hougang MRT Stn. Plus the present one is a temporary one
Originally posted by SBS2656X:In 2017 or earlier as stated by the blueprint showcased a couple of years ago outside Hougang MRT Stn. Plus the present one is a temporary one
So long? Damn Hot The Present Hougang Central Bus Interchange. 4 Years ,Cannot Tahan.I thought is 2014 siah
Originally posted by SBS 6238T:So long? Damn Hot The Present Hougang Central Bus Interchange. 4 Years ,Cannot Tahan.I thought is 2014 siah
They will start developing between 2014-2015 and will complete by 2017...
Hopefully they will develop Hougang faster...
I also pity all BCs who needed to brave the rain just to reach the bus to drive in Hougang Int when it rains.
Originally posted by SBS2656X:I also pity all BCs who needed to brave the rain just to reach the bus to drive in Hougang Int when it rains.
Me too.I also pity the BC that is needed to brave the rain just to reach the bus to drive in Hougang Int when it rains.
Originally posted by SBS2656X:They will start developing between 2014-2015 and will complete by 2017...
Hopefully they will develop Hougang faster...
Have to wait 3 years before fully complete and which month will start develop?
DELETED
Originally posted by SBS 6238T:Have to wait 3 years before fully complete and which month will start develop?
Not sure though. Only stated 2013-2014.
Also, the new planned interchange will be like Serangoon's, which is air conditioned, and should be facing Hougang Ave 10 and Hougang Central, 2 exits. Yes it will be on the field in front of the interchange.
About the transfer of buses,i want to know how they transfer the buses.For example,if wanna transfer buses to other bus depots like from HGDEP to SLBP, is the BC from HGDEP will go transfer the bus or the BC from SLBP will come and take the bus?
Originally posted by SBS 6238T:About the transfer of buses,i want to know how they transfer the buses.For example,if wanna transfer buses to other bus depots like from HGDEP to SLBP, is the BC from HGDEP will go transfer the bus or the BC from SLBP will come and take the bus?
Nobody knows.
It's just one fine day, and then the next day, *POOF* the bus appear on another depot service.
I am surprised to see AMDEP 169 (1081S and 1095C to be specific) drivers after its duty transfer to WLDEP.