New Causeway Link Cross-border service CW6 between Boon Lay and Gelang Patah/Bukit Indah via Second Link will be introduced from 17 Aug 2011.
Initial fleet size will be 6 operating only during peak hours, then increasing to 10 and operating during off-peak hours as well.
It was revealed that the daily ridership of CW3, CW3S, CW4 and CW4S is 4,000.
yup, BNL Int.
What is that bus on the right?
Originally posted by sbs7207b:What is that bus on the right?
Should be a hino bodied by SKSBus.
This is what I'm suspecting
15 mins freq, x-fer at Tg Kupang.
Cos 8 buses, it means freq of 25 mins minimum if it does full route.
yup... saw the standee banner at jurong east int (CW3 queue)
Inside article, Handal Indah hopes to takeover and develop some bus terminal land.
They've lost focus onto serving JB routes.
http://www.chinapress.com.my/node/242538
CW5 got go Kota Raya meh?
Peak hour sv
Ops
Weekday
From Boon Lay: 0700 - 1000, 1700 - 2230
From Bt Indah: 0500 - 0900, 1600 - 2200
Sat
From Boon Lay: 0700 - 2000
From Bt Indah: 0600 - 1900
Sun
From Boon Lay: 0900 - 2200
From Bt Indah: 0800 - 2100
IDR may see a new operator which will start operations next year, CW's biggest threat yet. That new operator may also operate into Singapore, provided that it's lucrative enough and new licences being offered for operators.
Originally posted by sbs7207b:What is that bus on the right?
SKSbus SA12-300 integral model. Essentially a citybus version of the CJ8-TKE integral model also by sks. SA12-300 built on the Ci09 body whereas CJ8-TKE on the e128i body. Powered by the Hino J08E engine. sks' first low-entry model.
IDR needs its proper public tpt plans.
That should keep the viable ones profitable.
I believe even HI is finding difficulty in maintaining its own domestic svs.
where is CW6 boarding berth @ boon lay int? is the bus loop inside the int or park there?
don b suprise if next time more CW service serve woodlands, sembawang or yishun or other north-west part of SG.
or 1 day Causeway link become SG 3rd bus company. haha
i had send feedback to SMRT abt operating more bus service from yishun and sembawang and they said its not needed at the moment.. =_=
By right SMRT can introduced 1 cross border svc from Sembawang to Larkin IF RWS decided to terminate their bus svc contract with SMRT.The fleets from RWS8 can be utilised for it,951 anyone?
Boon Lay Way
For M'sian buses, entry level is low. Any case, even HI is lamenting that their local bus ops is not very sustainable as compared to CW1/ CW2/ CW3/ CW4/ CW5.
But seriously, CW5's loading is miserable.
Originally posted by TIB1010Y:don b suprise if next time more CW service serve woodlands, sembawang or yishun or other north-west part of SG.
or 1 day Causeway link become SG 3rd bus company. haha
i had send feedback to SMRT abt operating more bus service from yishun and sembawang and they said its not needed at the moment.. =_=
LTA wun allow duplication of bus routes and in any case all the quotas are alrdy taken up.
Originally posted by DonMe:So many malaysia operators having operations over the causeway, when would our singapore bus operators do the same? Or they are not bothered and only let malaysia companies take over the whole operations of the causeway bus services?
there is TS1/ TS8 and AC7 (singapore operators).... compare to CW5/CW6 (malaysia operators)... what else?
Originally posted by TIB1010Y:where is CW6 boarding berth @ boon lay int? is the bus loop inside the int or park there?
In an article by another paper, it was mentioned that CW6 will call at the bus stop near Boon Lay MRT Exit B.
Originally posted by Superbus:In an article by another paper, it was mentioned that CW6 will call at the bus stop near Boon Lay MRT Exit B.
yup
that bus-stop along boon lay way
can refer to handal indah webbie
Originally posted by lemon1974:there is TS1/ TS8 and AC7 (singapore operators).... compare to CW5/CW6 (malaysia operators)... what else?
8 licences were offered jointly by Singapore and Malaysia, to be equally given to operators from both sides.
4 licences from Singapore were awarded to:
The RWS route will be from Bt Indah via 2nd Link
The MBS route will be from Larkin
cross-border can be made more efficient if they allowed oprators from both countries to operate it and call at more stops on either side of the boreder.