More update:
More of the bus stop berth piler are done and the road for the bus park and boarding breth are also in the mid of the construction. And I think they are doing the land measuring for a shelter walkway linking to the MRT stn.
Originally posted by 28_29_293:17, 18, 60, 69 mayb call outside Bedok Temp Int bus stop perhaps
Maybe some BDK routes may be amended, who knows.
9 & 35 can start from EUN. That side very dead.
Originally posted by SBS 1000U:
Should extend 18 to Eunos.
18 can take over 7 easily.
Originally posted by iveco:18 can take over 7 easily.
Don't think so. Extend 7 to Tampines will cause more stress to the service.
I was thinking of extending 18 to Eunos via Marine Parade to Kembagan to Eunos, since there is no direct link from Kembagan to Marine Parade right now.
Update!
The roof work has started at the tempt int.
Update!
The roof work is done for the supporting structure.
Update!
The roof structure is done for installing and has started painting. The construction of a toliet/ office has started.
Update:
The construction of basic structure on boarding area A is done. Now, construction for boarding area B has started. After the construction, you will see a 'L' shape int.
I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..
Originally posted by TIB1010Y:I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..
I hope YSN will be DD-friendly when it is rebuilt. Hopefully K Shanmugan decides to expedite it to win more support in 2015.
next Election shd be in 2016 rite
How to upload photo?
Anyway, just a update. Now they are doing a 'U' shape int, with a entrance orexit located at the right corner of the 'U'. For the right side of the 'U', the piler and the roof structure is done. For the base of the 'U', the construction of the piler and the roof structure is half-way-through for bothe entrance or exit and the berth. For the left side of the 'U', the piler work has just started......
Originally posted by TIB1010Y:I m curious.. any pic?? thx... i still wondering when yishun int will be upgraded.. the shops ard the int had recently been close to giveway for new developement..
I will take some tomorrow and will upload it in my blog or Facebook, confirm with you tomorrow.
Is it possible to built a multi-storey bus Interchange rather than air con ones?AC Int is overkill.
Update:
For the base and the left of the 'U', they are building both the piler and the roof structure at the same time, so it's faster. Then, a long stretch of room structure is built for the suspected staff office, NTWU canteen, toilet and BUZZ.
squarish
Solutions
- Terminate some services at Eunos Int instead of Bedok Int.
- Terminate some services at BNDEP.
- Extend and terminate some services to Tampines Int.
Example:
Service 854 to start from Eunos Int.
Alternative will be Service 25.
Originally posted by Junyang700:Solutions
- Terminate some services at Eunos Int instead of Bedok Int.
- Terminate some services at BNDEP.
- Extend and terminate some services to Tampines Int.
Example:
Service 854 to start from Eunos Int.
Alternative will be Service 25.
Originally posted by vicamour:
I think it will affect many commuters and disrupt many operations of most SBST services. Tampines already crowded enough, so don't extend anymore services there. I think SBST can handle the operations well in the temp interchange, like they did for Boon Lay interchange. But maybe they can extend a few services permanently to Eunos, like 18, 35. And maybe 196 to Upper East Coast terminal via Tanah Merah MRT.
Anyway, govt planning bus routes, probably they might start with Bedok.
Originally posted by SBS8155K:Wat about S’goon Bus Int?
Jurong East Temp Int start construction
Bedok temp interchange is fully completed.
Think should be opening soon...