Originally posted by sbst275:Massive jam due to road works. Buses diverted away from Ave 1 as much as possible
which part of ave 1?
Originally posted by JaSoNhSu92:
which part of ave 1?
it depended on e pace of road repave
It started from yesterday (though repaving works actually started last week from Parc Oasis tat side).
I did saw 185 diverted to using Jurong East St 31 at ard 1pm. Aft 2pm, buses made to skipped Ave 1 totally.
it all depends on OCC's instruction to every BC prior to commencing trips from BNL. not too sure for 99 & 185
then 157/185 must go long way lor
JE Ave 1 > turn right to JE St 31 > turn left to Boon Lay Way > Jurong Town Hall Rd(orignal route)
so today which part is affected?
is it all Ave 1 services use diversion method?
Sv 157 used Jurong Rd straight. Follow 174's routing.
I think 198 used Corporation Rd, Boon Lay Way.
not too sure abt 333, 334 & 335.
BNL Int placed e notice at departure TV screen
Sv 98, 99, 157, 185, 198, 333, 334, 335, 502 are affected and may skip Jurong East/ West Ave 1.
Heard from BC quite jialat.. until it's close to impassable to traffic.
Originally posted by sbst275:
it depended on e pace of road repaveIt started from yesterday (though repaving works actually started last week from Parc Oasis tat side).
I did saw 185 diverted to using Jurong East St 31 at ard 1pm. Aft 2pm, buses made to skipped Ave 1 totally.
it all depends on OCC's instruction to every BC prior to commencing trips from BNL. not too sure for 99 & 185
Repaving works at Jurong Town Hall Rd/Jurong East Ave 1 junction & Jurong East Ave 1 between St 32 & Jurong Town Hall Rd?
Road widening project of Jurong Town Hall Rd between PIE & Boon Lay Way create some problems for buses plying these road
Originally posted by service_238:expand the damn road instead of keep resurfacing… zzz
Road Widening Project
Widening of Jurong Town Hall Rd between PIE/BNL Way & Jurong East Ctrl/AYE (in progress)
Widening on BNL Way between Corporation Rd/Jln BNL
Originally posted by brotherchen1982:
Road Widening Project
Widening of Jurong Town Hall Rd between PIE/BNL Way & Jurong East Ctrl/AYE (in progress)
Widening on BNL Way between Corporation Rd/Jln BNL
both are in progress actually.. I saw some new kerbs at Boon Lay way near Corp Rd junction eastbound..
I was talking about Jurong East/West Ave 1...
reason why resurface is because of the level of drain holes which is located at one row of road kerb does not match with the road surface level
each lanes at jurong west/east ave 1 is not enough space to let the bigger vehicles pass through when both beside got vehicle, especially jw ave 1/st 41, jw ave 1/st 52/st 42 junction there
Originally posted by JaSoNhSu92:reason why resurface is because of the level of drain holes which is located at one row of road kerb does not match with the road surface level
A lot of stretches of Jurong East/West Ave 1 have road surface below the kerb drain level, some near bus bay/junctions/traffic lights
Road widening is not e issue, is it expected increase in traffic load.
Tat why I guess they've decided to let 157 use Jurong Rd. 99, 185, 198 left behind.
So I guess it's going to go on for e next coming days
Originally posted by service_238:
I was talking about Jurong East/West Ave 1...
Didn't expect they will resurfaced this stretch of road as it has high volume of traffic flows throughout a day
In the past, any road works(except cables/gas works) along this stretch of road are usually done after peak hours and/or wkends/PHs
Originally posted by sbst275:Road widening is not e issue, is it expected increase in traffic load.
Tat why I guess they've decided to let 157 use Jurong Rd. 99, 185, 198 left behind.
So I guess it's going to go on for e next coming days
Now the Notice includes "Bus Services will diverted & will skipped some bus stops along the affected areas"
Originally posted by brotherchen1982:
Didn't expect they will resurfaced this stretch of road as it has high volume of traffic flows throughout a day
In the past, any road works(except cables/gas works) along this stretch of road are usually done after peak hours and/or wkends/PHs
but they can't do at night w/ e no of HDB units affected
so llst
Originally posted by sbst275:
but they can't do at night w/ e no of HDB units affectedso llst
normally stop around 9-10pm++ for night works but now if you cause any inconvenience to others on anytime of the day, ppl will ASAP shoot letters to Stomp/ST/LTA/relevant authorities...
How long will this road works last???
Originally posted by JaSoNhSu92:
which part of ave 1?
Jurong East Ave 1 (Towards Jurong West) for today.
Only right lane is affected, the left one still can be used.
The JE Ave 1 (towards IMM) is not affected at all. And there is no bus diversion as of now.
Originally posted by brotherchen1982:
Road Widening Project
Widening of Jurong Town Hall Rd between PIE/BNL Way & Jurong East Ctrl/AYE (in progress)
Widening on BNL Way between Corporation Rd/Jln BNL
FOr the junction between JE Ave 1 and Jurong Town Hall Road:
The widening of jurong town hall road had been finished a few months ago but JE Ave 1 one is still on.
How abt svc 187?? did SMRT alow the bus svc to divert?
Originally posted by TIB657M:Jurong East Ave 1 (Towards Jurong West) for today.
Only right lane is affected, the left one still can be used.
e jam is e one tat made e bus diversion as well
I think e residents walk home is faster than e bus